Services


Contact

Glen Fielder
Glen Fielder (General Manager) Tel: +44 (0) 2380 428700
Mob: +44 (0) 7738 889196
Email: glen.fielder@t-s-e.co.uk
Bob Crook
Bob Crook (Production Manager) Tel: +44 (0) 2380 428700
Mob: +44 (0) 7712 788724
Email: bob.crook@t-s-e.co.uk

Control Panels Eastney WPS Replacement of Diesel Pump Control Panels

Eastney WPS Replacement of Diesel Pump Control Panels

Eastney WPS Replacement of Diesel Pump Control Panels

Scope of works

Design and manufacture to Southern Water’s MED (Engineering) Specifications, ensuring compatibility with the existing Diesel Engine Pumps.

  • 6 No. Diesel Pump Control Panels Custom Built to Form 2, providing Front and Rear Access.
  • The Diesel Pump Panels included:
    • Rockwell SLC505 Ethernet Linked PLC.
    • Watson & Smith Manuset Loading Panel and Gauges
    • 40 way Annunciator panel
    • Pyropress Temperature Signal Conditioners and Trip Amps
  • Fault finding on the existing engines and panels.
  • Point to Point testing of existing to generate new Function Design Specification (FDS).
  • Decommissioning of Existing Diesel Panels and Installation of New.
  • Sequential Installation to maintain critical plant availability.
  • Full Site Acceptance Testing (SAT) & Commissioning.
  • The supply of full documentation including Declaration of Conformity Certification confirming adherence to BS EN604391:1999, LV Directive and the EMC Directive and Southern Water COM/ WOM.

Southern Water


TSE is Southern Water's Standard Asset Supplier.

Client
Southern Water
Contract
Eastney WPS Replacement of Diesel Pump Control Panels

TSE Registrations